When exporting a corridor from Civil 3D 2014 using Trimble Link, slopes are assigned this way.
If there is a slope assigned and a daylight exists then both cut and fill slopes assigned to template have this value.
If the template was made using Trimble GeoOffice or Trimble Buisness Center then it could be possible that fill and cut values were different.
If there is a slope assigned and a daylight exists then both cut and fill slopes assigned to template have this value.
If the template was made using Trimble GeoOffice or Trimble Buisness Center then it could be possible that fill and cut values were different.
No comments:
Post a Comment